Power Magic Supervision Service
  • Power Magic Supervision Service

Power Magic Supervision Service

0158458
SOFAR
Power Magic Supervision Service
€6,685.25
€6,685.25 €5,525.00 €6,685.25 €5,525.00
VAT included VAT included VAT excluded VAT included VAT excluded
€5,525.00 VAT excluded
€6,685.25 VAT included
€1,160.25 Tax
€5,525.00 VAT excluded
€1,160.25 Tax
€6,685.25 VAT included
Quantity

Ask about the product on WhatsApp
Description

Only for:

Germany, Austria, France, Belgium, Netherlands, Luxemburg

This support must be booked for the 1st Energy Storage Cabinet. Support for additional Storage or Battery Cabinets must be added separately (per cabinet = 1 support service).

Booking this commissioning support is a prerequisite for maintaining the manufacturer's warranty. Alternatively, certification training can be completed.

The required checklist for this service can be found here in the appendix.

Transportation, assembly and installation must be carried out by the customer prior to commissioning as part of this support service. The required installation material must be checked based on the instructions and the local conditions and provided by the customer.

In addition to the individual system components of the Power Magic, the Supervision Commissioning Support is part of the firmly defined procedure for the commercial storage system. The experienced service technician is available to assist you on site. The scope of services includes visual inspection of the AC and DC installation, connection and testing of the liquid cooling system, system updates and configuration through to final commissioning. Local preparations, system transportation, assembly and installation must be carried out on site in advance.

Product benefits:
? On-site service by a Sofar-certified technician
? Competent installation monitoring + commissioning + function test

Services included
System cold commissioning:
? Visual inspection
? Inspection of power cables, communication cables, liquid cooling piping, fire protection piping, earthing, control cabinet walls, fire extinguishing sludge
? Pressure holding test fire extinguishing system + liquid cooling system
System hot commissioning:
? Coolant injection liquid cooling system
? Pressure test of the fire extinguishing cylinder
? On-site software version check
? Door magnet/lighting function test
? Switching the system on and off
? Emergency stop test
System acceptance test:
? Web display test
? Charging and discharging test
? Solenoid valve connection of the fire extinguishing cylinder
Basic training:
? For O&M personnel
Reports:
? Commissioning and site acceptance report
Product Details
SOFAR
0158458

You can customize it or disable in the backoffice: Modules / Module manager / Product Extra Tabs.

Sample bullet list

  • Regular fit has a straight cut with room to move naturally
  • 48% polyester / 48% acrylic / 4% wool
  • Faux leather sleeves
  • Full zip
  • Padded

Sample numbered list

  1. Wipe clean with a damp cloth
  2. Color may rub off onto other materials
  3. Do not store in wet conditions

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.